diff options
author | Rick Walsh <rickmwalsh@gmail.com> | 2015-09-16 19:57:24 +1000 |
---|---|---|
committer | Dirk Hohndel <dirk@hohndel.org> | 2015-09-16 21:16:58 -0700 |
commit | 95720e94eee79abd64dcc16969ad6b91d7c1ae50 (patch) | |
tree | e41aff244c91276cee954ff07e64fdf78f526b12 /planner.c | |
parent | 5b77b162a3c5b0e2f4d00a02a1de2fbee06842fc (diff) | |
download | subsurface-95720e94eee79abd64dcc16969ad6b91d7c1ae50.tar.gz |
VPMB gradient of imperm: don't confuse atm and bar
Other VPM-B implementations (V-Planner, MultiDeco, Fortran code) take the
default gradient of onset of impermeability as 8.2 atm. We use bar as the
pressure unit, and 8.2 atm = 8.30865 bar.
This has negligible effect on all of the calculated plans I've tested, resulting
in a maximum decrease of 1 minute in total dive time for ~150 m deep dives, but
we should get unit conversions correct anyway.
Signed-off-by: Rick Walsh <rickmwalsh@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
Diffstat (limited to 'planner.c')
0 files changed, 0 insertions, 0 deletions