summaryrefslogtreecommitdiffstats
path: root/dives
diff options
context:
space:
mode:
Diffstat (limited to 'dives')
-rw-r--r--dives/sac-test.xml30
1 files changed, 20 insertions, 10 deletions
diff --git a/dives/sac-test.xml b/dives/sac-test.xml
index 14ee3f17b..fe0f51994 100644
--- a/dives/sac-test.xml
+++ b/dives/sac-test.xml
@@ -6,7 +6,7 @@
<location>SAC test dive 1</location>
<notes>SAC should be 20l/min (0.7063 cuft/min)
We have exactly 100 ATM of gas in a 10l cylinder, average 10m for 25min</notes>
- <cylinder size='10 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='10.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
<divecomputer>
<depth max='10.0 m' mean='10.0 m' />
<sample time='0:00 min' depth='10.0 m' />
@@ -21,7 +21,7 @@ We have exactly 100 ATM of gas in a 10l cylinder, average 10m for 25min</notes>
<location>SAC test dive 2</location>
<notes>SAC should be 20l/min (0.7063 cuft/min)
We have exactly 100 ATM of gas in a 10l cylinder, average 10m for 25min</notes>
- <cylinder size='10 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='10.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
<divecomputer>
<depth max='20.0 m' mean='10.0 m' />
<sample time='0:00 min' depth='0.0 m' />
@@ -33,11 +33,11 @@ We have exactly 100 ATM of gas in a 10l cylinder, average 10m for 25min</notes>
<location>SAC test dive 3</location>
<notes>SAC should be 20l/min (0.7063 cuft/min)
We have exactly 100 ATM of gas in 15l of cylinder, average 20m for 25min</notes>
- <cylinder size='10 l' description='10l' start='202.6 bar' end='101.3 bar' />
- <cylinder size='5 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='10.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='5.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
<divecomputer>
+ <depth max='40.0 m' mean='20.0 m' />
<event time='17:00 min' name='gaschange' />
- <depth max='20.0 m' mean='10.0 m' />
<sample time='0:00 min' depth='0.0 m' />
<sample time='5:00 min' depth='20.0 m' />
<sample time='10:00 min' depth='40.0 m' />
@@ -46,16 +46,16 @@ We have exactly 100 ATM of gas in 15l of cylinder, average 20m for 25min</notes>
<sample time='25:00 min' depth='0.0 m' />
</divecomputer>
</dive>
-<dive number='4' date='2013-02-24' time='12:26:04' duration='25:00 min'>
- <location>SAC test dive 3</location>
+<dive number='4' date='2013-02-24' time='12:26:04' duration='30:00 min'>
+ <location>SAC test dive 4</location>
<notes>SAC should be 20l/min (0.7063 cuft/min)
This adds a 5-minute surface time to the middle of the dive.
We have exactly 100 ATM of gas in 15l of cylinder, average 20m for 25min</notes>
- <cylinder size='10 l' description='10l' start='202.6 bar' end='101.3 bar' />
- <cylinder size='5 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='10.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <cylinder size='5.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
<divecomputer>
+ <depth max='40.0 m' mean='16.666 m' />
<event time='22:00 min' name='gaschange' />
- <depth max='20.0 m' mean='10.0 m' />
<sample time='0:00 min' depth='0.0 m' />
<sample time='5:00 min' depth='20.0 m' />
<sample time='10:00 min' depth='40.0 m' />
@@ -65,5 +65,15 @@ We have exactly 100 ATM of gas in 15l of cylinder, average 20m for 25min</notes>
<sample time='30:00 min' depth='0.0 m' />
</divecomputer>
</dive>
+<dive number='5' date='2013-02-24' time='13:26:04' duration='25:00 min'>
+ <location>SAC test dive 5</location>
+ <notes>SAC should be 20l/min (0.7063 cuft/min)
+This verifies that it works without any sample data too.
+We have exactly 100 ATM of gas in 15l of cylinder, average 20m for 25min</notes>
+ <cylinder size='10.0 l' description='10l' start='202.6 bar' end='101.3 bar' />
+ <divecomputer>
+ <depth max='13.5 m' mean='10.0 m' />
+ </divecomputer>
+</dive>
</dives>
</divelog>