The existing code has an embarrassing error in its logic. It picked the
last dive in the table and made sure that the relative start time was
either N minutes after 'now' or N minutes after the last dive ends,
whichever is later.
But once the planned dive has been added to the dive list (so once we have
a first depth and time entry, that last dive now is the planned dive. And
every time focus left the start time field the start time would be
recalculated relative to the end of the dive we are currently planning.
With this patch we instead simply remember the number of the last dive
just as we create the dive plan and use that to look up the end time of
previous dive. I could have just stored that end time but I figured maybe
there could be other reasons to go back to the last dive before the
planned dive, so this seemed cleaner.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This should do the same as the GTimeZone variant.
Also works on Windows.
Signed-off-by: Lubomir I. Ivanov <neolit123@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
The problem is that when we reach the gas change depth and compute the
stop time, no gas change event is created yet but time_at_last_depth tries
to determine the gas for the stop from events.
So instead we pass o2 and he as parameters of that function and calculate
the wait time based on that information.
Signed-off-by: Robert C. Helling <helling@atdotde.de>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
We stored the He permille instead of the He percentage. But for most
casual testing this was hidden by the previous bug.
Reported-by: Robert C. Helling <helling@atdotde.de>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
The planner had a fatal flaw in that it ALWAYS started with AIR, even when
clearly claiming to use the correct gas. We only picked up correct gases
from events, but not at the beginning of the dive (where there is no
event).
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Linus pointed out that the warning wasn't shown until the main loop got
control back, so even a gtk_widget_show_all() doesn't really help to make
sure that things are shown right then.
This commit adds a little loop to handle all pending gtk_events before
exiting the show_error() function. Now the warning should be shown BEFORE
a potentially slow calculation gets started.
Suggested-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Just a tiny change to make them look more consistent.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Since we now support dives all the way down to 400m we should also support
deeper stops. And of course this can create insanely long dive plans, so
make sure there is plenty of space for those.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Printf is not a way to issue warnings and errors. This is a very late
addition but seems necessary for a viable release of the planner.
This also adds one artificial limit and two warnings:
a) no dives deeper than 400m
b) warning of potentially very long calculation times for dives longer
than 3h (180min) before the ascent and dives deeper than 150m
It also creates quite a number of new strings that need to be translated
(and marks a few existing ones for translation as well).
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
To quote Linus, gentle as always:
Stuff like this is just BS.
Don't do it. You already fixed the bug with matching gas change events,
so adding this idiotic workaround no longer fixes anything, and its
confusing and actively misleading.
It's not even percent. It's still permille, just rounded. So it's a
nonsensical number and a misleading name. Just delete it as the abortion
it is. It is only going to cause more problems later.
Just use the correct value.
Suggested-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Two separate bugs.
a) Air cylinders were created with o2=209 and no other value set.
sanitize_gasmix() turned that into o2=0 which meant that this cylinder was
now identified as "nodata", i.e., unset.
We now set a fake cylinder name to deal with that issue.
b) the gaschange event is inherited from libdivecomputer and therefore
only supports 1 percent granularity for o2 and h2. Since we didn't round
when assigning the value we ended up with air being stored as o2=20 he=0
which of course then didn't match air anymore (which we have defined as
208 <= o2 <= 210).
We now use o2=210 for air in the planner and carefully round the permille
values whenever we convert into percent - and compare gases with percent
granularity as well.
A better fix for b) would be to change the Subsurface event to not simply
copy the libdivecomputer behavior and use percent granularity but support
permille instead. But this closely before the 3.0 release that seemed like
a far too invasive change to make - the changes to the planner should have
no impact outside the planner module.
Reported-by: Chris Lewis <chrislewis915@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
While this is a pain for everyone, I decided not to edit out the code
reference noise - after all this is supposed to help translators find
where the text is used in case it's unclear how to translate something.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
In commit b6c9301e5847 ("Move more dive computer filled data to the
divecomputer structure") we moved the fields that get filled in by the
dive computers to be per-divecomputer data structures.
This patch re-creates some of those fields back in the "struct dive",
but now the fields are initialized to be a reasonable average from the
dive computer data. We already did some of this for the temperature
min/max fields for the statistics, so this just continues that trend.
The goal is to make it easy to look at "dive values" without having to
iterate over dive computers every time you do. Just do it once in
"fixup_dive()" instead.
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
There are two ways to look at surface pressure. One is to say "what was
the surface pressure during that dive?" - in that case we now return an
average over the pressure reported by the different divecomputers (or the
standard 1013mbar if none reported any).
Or you want to do specific calculations for a specific divecomputer - in
which case we access only the pressure reported by THAT divecomputer, if
present (and fall back to the previous case, otherwise).
We still have lots of places in Subsurface that only act on the first
divecomputer. As a side effect of this change we now make this more
obvious as we in those cases pass a pointer to the first divecomputer
explicitly to the calculations.
Either way, this commit should prevent us from ever mistakenly basing our
calculations on a surface pressure of 0 (which is the initial bug in
deco.c that triggered all this).
Similar changes need to be made for other elements that we currently only
use from the first divecomputer, i.e., salinity.
Reported-by: Robert C. Helling <helling@atdotde.de>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This is a late string change, but I think this may be a valid exception of
the string freeze...
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
UTF-8 strings could create more characters.
Signed-off-by: Sergey Starosek <sergey.starosek@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
Conflicts:
po/nb_NO.po
po/ru_RU.po
|
|
One is about the amount, the other about the specific type of gar that was
used.
Reported-by: Sergey Starosek <sergey.starosek@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Translations that use UTF-8 could easily create more characters than I had
initially specified.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This moves some double/floating handling for po2 to plain integer. There
are still non int values around (also for phe and po2) in the plot area.
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Fixing the SP change event and introducing a bailout scenario.
I decided not to use a event showing SP=0.0 nor using a gaschange event as
is in fact there is no gas change related to bailing out itself. If there
is also a gaschange for the event it will be displayed anyway.
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Fixes bug in planner which prevents from bailing out (setpoint = 0).
Also introduces events for changing setpoints in planner.
It also makes the eventtype for gaschange slightly more consistent by
changing it from SAMPLE_EVENT_GASCHANGE (O2 only) to
SAMPLE_EVENT_GASCHANGE2 (O2/He). But Subsurface treats them both the same
(the distinction comes from libdivecomputer).
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
current_time_notz():
Attempt to use g_time_zone_find_interval() to retrieve a
timezone interval, which is then passed to g_time_zone_get_offset()
Reported and tested-by: Sergey Starosek <sergey.starosek@gmail.com>
Signed-off-by: Lubomir I. Ivanov <neolit123@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
The planned dive always has to be the last dive in the dive list. To make
sure of that we interpret the relative start time to be relative to either
the current time or the end of the last dive, whichever is later.
This fixes a bug where we would delete the wrong dive and get our data
structures confused by planning multiple dives out of order.
Reported-by: Sergey Starosek <sergey.starosek@gmail.com>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Mostly coding style and whitespace changes plus making lots of functions
static that have no need to be extern. This also helped find a bit of code
that is actually no longer used.
This should have absolutely no functional impact - all changes should be
purely cosmetic. But it removes a bunch of lines of code and makes the
rest easier to read.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Mostly in new code, but some of them are strings in older code that have
been missed in the past.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Add a sample at time 0 to allow for a pO2 from the start of the dive.
Remember the last pO2 so it doesn't have to be repeated (and the right
thing happens for the planned part of the dive).
This still doesn't allow us to change the setpoint at a certain depth
(which would be analogous to being able to switch to a certain gas at a
certain depth in OC plans), but with this commit it's already usable.
This commit also fixes a couple of small bugs in commit b8ee3de870fa
("Dive planning for closed circuit rebreather") where a pO2 of 1.1 was
hardcoded in one place, throwing off all plan calculations and integer
math was used to calculate a floating point value (leading to most pO2
values actually used being 1.0).
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This misses a single issue to be used as a base for further discussion:
The CC setpoint is used for the next segment, not the one specified for. I
also have in mind to modify the existing code to use setpoints specified
in mbar and plain integer instead of float values.
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This cleans up our handling of combo boxes and all the duplicated
completion logic, and simplifies the code.
In particular, we get rid of the deprecated GtkComboBoxEntry. While it
made some things easier, it made other things harder. Just using
GtkComboBox and setting that up correctly ends up being simpler, and
also makes the logic work with gtk-3.
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Linus seems to have been too eager in the dc refactoring: a diveplan
doesn't have a divecomputer.
Signed-off-by: Henrik Brautaset Aronsen <subsurface@henrik.synth.no>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This moves the fields 'duration', 'surfacetime', 'maxdepth',
'meandepth', 'airtemp', 'watertemp', 'salinity' and 'surface_pressure'
to the per-divecomputer data structure. They are filled in by the dive
computer, and normally not edited.
NOTE! All actual *use* of this data was then changed from dive->field to
dive->dc.field programmatically with a shell-script and sed, and the
result then edited for details. So while the XML save and restore code
has been updated, all the displaying etc will currently always just show
the first dive computer entry.
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
The planner interactively responds to changes to the GFlow and GFhigh in
the dialog and calculates an appropriate profile. If there is a previous
dive within the 48 hours prior to this dive then its saturation is
correctly taken into account if the gradient factors are changed - so if
they are aggressively lowered it is possible to start the dive with
already an existing ceiling (simply increase the surface interval to 'fix'
that).
Once the plan is accepted the GF values are reset to the current
preferences. This can cause the ceiling in the plot to change and the deco
stops to no longer match the ceiling - but that's a logical consequence of
the ability to change a temporary copy of GFlow/GFhigh during the planning
process and not the actual preferences (which would be counter intuitive,
I think).
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Commit 293126257b20 ("Mark divelist as changed if user accepts planned
dive") had the correct commit message but an incorrect implementation.
This moves the mark_divelist_changed() call into the GTK_RESPONSE_ACCEPT
clause where it belongs.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
When the user clicks OK in the dive planner and the dive is added to the
divelist the divelist needs to be marked as changed so Subsurface prompts
the user to save the file before quitting.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This works on the assumption that the diver uses the deco SAC rate while
on a calculated deco stop and the bottom SAC rate during the rest of the
dive (including the time they move from deco stop to deco stop).
This is making the planning function mostly useful for open circuit
diving.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This makes it easy to print out a dive plan - it's simply stored in the
notes of the simulated dive we create.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This just provides the infrastructure to enter the data, nothing is
calculated, yet.
This adds a new get_thousandths() helper function so we can enter
information of the 'mili-' type as decimal values. So things like
"14.5 l/min" or "0.75 cuft/min" are parsed correctly and converted
into a ml value.
In the process of implementing that I also fixed a bug introduced in
commit ab7aecf16e96 ("Simplify dive planning code") which broke the
get_tenth() function.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This is just preparation for the next set of changes.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This patch removes the need for the "string" pressurebuf in planner.c.
It also adds a unit to the partial pressures displayed in the mouse
overlay which are always displayed in bar.
BTW: Has anyone seen a pO2 shown in PSI?
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Subsurface follows the lead of most divecomputers to use times without
timezone - so all times are implicitly assumed to be local time of the
dive location; so in order to give the current time in that way we
actually need to add the timezone offset.
Instead of relying on OS specific members of struct tm we use the glib
timezone functions to get the timezone offset for us. Of course, the
function used to do this is only in glib 2.26 or newer, which once again
means that Debian stable won't be supported. But since that doesn't build
other parts of Subsurface, either, I think I'll live with that.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This patch centralizes the definition for surface pressure, oxygen in
air, (re)defines all such values as plain integers and adapts calculations.
It eliminates 11 (!) occurrences of definitions for surface pressure and
also a few for oxygen in air.
It also rewrites the calculation for EAD, END and EADD using the new
definitons, harmonizing it for OC and CC and fixes a bug for EADD OC
calculation.
And finally it removes the unneeded variable entry_ead in gtk-gui.c.
Jan
Signed-off-by: Jan Schubert <Jan.Schubert@GMX.li>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
Previously we would simply show the first dive in the divelist - which
worked fine in the default sort by trip setting and assuming that there
are no dives from the future in the divelist.
With this commit we actually find the correct dive in the divelist and
select it instead. If you sort by depth you will see the dive move around
in the divelist, but it will stay selected and visible in the profile.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
.. and rename the badly named 'output_units/input_units' variables.
We used to have this confusing thing where we had two different units
(input vs output) that *look* like they are mirror images, but in fact
"output_units" was the user units, and "input_units" are the XML parsing
units.
So this renames them to be clearer. "output_units" is now just "units"
(it's the units a user would ever see), and "input_units" is now
"xml_parsing_units" and set by the XML file parsers to reflect the units
of the parsed file.
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
We have several places where we interpolate the depth based on two
samples and the time between them. Some of them use floating point, some
of them don't, some of them meant to do it but didn't.
Just use a common helper function for it. I seriously doubt the floating
point here really matters, since doing it in integers is not going to
overflow unless we're interpolating between two samples that are hours
apart at hundreds of meters of depth, but hey, it gives that rounding to
the nearest millimeter. Which I'm sure matters.
Anyway, we can probably just get rid of the rounding and the floating
point math, but it won't really hurt either, so at least do it
consistently.
The interpolation could be for other things than just depth, but we
probably don't have anything else we'd want to interpolate. But make the
function naming generic just in case.
Signed-off-by: Linus Torvalds <torvalds@linux-foundation.org>
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This change ended up being quite a bit bigger than expected as it
uncovered a number of bugs in the existing code.
The planner now handles gas changes correctly by creating (and later
parsing) events in the simulated divecomputer. At the end of the dive
specified in the input form the algorithm starts with the deepest
interesting depth: either the first stop below our ceiling or the deepest
depth at which we can change gases. It then traverses all the stop and all
the gas change depth and at each stage ensures that we are allowed to
ascend further before going on.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
An entry with no time is considered special and not considered when
constructing the profile.
This should allow us to add support for two different ways of adding
information about available gas:
changedepth 0 gasmix
0 0 gasmix @ po2
The first syntax basically says "during the ascent, switch to this gas at
this depth.
The second one says "switch to this gas once the pO2 allows for it"
Neither of these are implemented, yet, but this commit is necessary in
order for the rest of the code to ignore entries with a time field of 0.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This commit makes sure we have a reasonable default surface pressure (we
need an input field for that).
It also adjusts the debug level settings so that compiling this with
make CLCFLAGS=-DDEBUG_PLAN=3
will print out an almost usable dive plan.
This is of course still lacking air consumption calculations and will show
deco stops that we just transit through (if the ceiling lifts far enough
during the transition to an intended stop that this stop can be skipped;
this sometimes happens for the first stop (haven't seen it for a later
one). But it's better than nothing, I guess.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
We may want to make this configurable, but I haven't seen any software
that doesn't do deco stops in full minutes.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
The existing code incorrectly started all calculation at the depth at the
end of the first segment. So if you went to 50m in 5min in your first
segment, you incorrectly got 5 minutes at 50m (instead of a progression
from 0 to 50m, over 5 minutes).
This commit fixes that and now gives us planned dives that then match what
is shown in the profile.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|
|
This shouldn't change the the actual stops we do or the travel time how we
get there, but it makes the code more logical. From the end depth of the
planned dive we have ONE transition to the first stop depth (which may be
the surface). And then for every stop we (potentially) have a wait and
travel to the next stop.
Once we are in the while loop, we know that we are at a stop level, so
there is no point to keep checking if we first need to transition to the
stop.
It does create one additional improvement: if we don't need any stops at
all, then we don't transition to the first stop and then from there to the
surface. We do it in one step. The overall profile / traveltime remains
the same, we just drop one intermediate sample on the way.
This also improves a few ugly (and in one case, wrong) debug statements.
Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
|