2015-09-22TestPlan: Add test for repeating diveGravatar Rick Walsh
If variables were accidentally carried through from a previous calculated plan, subsequent plan could be affected. This test aims to detect if this happens. Commit 8994270 corrected such a bug. If it were reverted, this test would fail (as it should). Signed-off-by: Rick Walsh <rickmwalsh@gmail.com> Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
2015-08-25VPM-B: Add more planner testsGravatar Rick Walsh
Add more VPM-B planner tests. The "expected" total run time is taken as the total run time produced by the Fortran VPM-B program. For all these tests, the results are within two minutes, which is a good result, but most are classified as a "fail". Signed-off-by: Rick Walsh <rickmwalsh@gmail.com> Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
2015-08-25Test another VPM-B dive planGravatar Rick Walsh
This adds a test for 100 m for 60 min dive on trimix using VPM-B Signed-off-by: Rick Walsh <rickmwalsh@gmail.com> Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
2015-08-23Add a test for the VPM-B mode of the plannerGravatar Robert C. Helling
Signed-off-by: Robert C. Helling <helling@atdotde.de> Signed-off-by: Dirk Hohndel <dirk@hohndel.org>
2015-07-05Add simple test for the dive plannerGravatar Dirk Hohndel
This sets up a standard dive scenario (30 minutes at 260ft/79m, EAN36 and Oxygen as deco gases, last stop at 20ft/6m) and calls the planner to set up a dive plan given certain standard gases. Instead of trying to verify the complete plans it checks that we switch to the deco gases at the right depth and the complete duration of the dive matches our expectation. The test intentionally fails right now for imperial as we have the wrong switch depth for Oxygen. See how useful tests are? On the downside, the test does NOT produce the same plan as Subsurface when I try to create a consistent setup for both - and I have not been able to figure out why. There must be some other parameters that I'm not setting, but I haven't identified them, yet. It's very small differences, for example in the metric case the stops at 21m, 9m, and 6m are each one minute shorter in the test than it what Subsurface calculates. Signed-off-by: Dirk Hohndel <dirk@hohndel.org>